Statistical Quality Control

Check tha attachment file. – Name of the used book in the project: Statistical Quality Control (A Modern Introduction) 6th EditionWritten by: Douglas C.

Document Preview:

Name of the used book in the project: Statistical Quality Control (A Modern Introduction) 6th EditionWritten by: Douglas C. Montgomery (International student version)- Solve part(A & B) in this project using one of the following languages : Matlab, Java or C. In part ( C ) in this project, try to use simple English language if possible. – Project Report contains the followings:A – Write a computer program for Example 10.5 on page 469 and reproduce the results.B – and solve problems 10.27, 10.28, 10.29, 10.30 using the same computer program of part (A)C – Notes on Optimum determination of target mean, production run length, and optimal production quantity using following materials:1 – The Modified Al-Sultan’s Model for Determining The Optimum Process Mean Under the Rectifying Inspection Plan by Prof. Chung-Ho ChenDepartment of Management and Information Technology, Southern Taiwan University of Technology, Tainan, Taiwan2- Optimum Process Mean Setting for Product withRework Process byChung-Ho Chen1* and Michael B. C. Khoo21Department of Management and Information Technology, Southern Taiwan University,Yungkang, Taiwan 710, R.O.C.2School of Mathematical Sciences, Universiti Sains Malaysia, 11800 USM, Penang, Malaysia3 – Designing the optimal process means and the optimal production run for a deteriorating processbyW. M. Chan and R. N. Ibrahim4 – Optimum process mean and manufacturing quantity settings for serial production system under the quality loss and rectifying inspection plan byChung-Ho Chen
0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply